SMT assembly and reflow build
Surface-mount assembly is reviewed with PCB panel data, BOM availability, stencil needs and placement file quality before release.
PCBA Turnkey RFQ
Upload Gerbers, BOM, CPL and assembly notes. Informic reviews sourcing, PCB data, SMT/DIP scope, inspection and test needs before build release.
Get PCB, BOM, assembly, inspection and test questions in one quote path.
Turnkey PCBA is easier to buy when shortages, file gaps, assembly scope and inspection expectations are reviewed before the order starts.
CPL, polarity, assembly drawings and test notes checked early.
Long-lead ICs, connectors and passives reviewed before boards wait for parts.
SMT, DIP, programming, test, packing and inspection expectations separated.
The quote should show what is ready, what is missing and what could delay the build.
The build package is reviewed around real assembly risks: SMT process, placement data, dense packages, mixed technology, kitting and test readiness.
Surface-mount assembly is reviewed with PCB panel data, BOM availability, stencil needs and placement file quality before release.
CPL/XY files, polarity marks, orientation notes and no-fit decisions are checked before the first board is built.
Dense packages, pitch, clearance, thermal behavior and inspection access need acceptance language before the build starts.
Connectors, terminal blocks, relays, capacitors and tall components change labor, soldering, inspection and packing assumptions.
PCB fabrication, component sourcing, kitting and assembly are presented as one managed path, not three disconnected vendors.
Fixtures, pogo pins, programming, functional test and packing expectations should be visible before production starts; AOI or X-ray is scoped when required.
| Assembly scope | SMT, DIP/through-hole, mixed assembly, BGA/QFN, connectors and special hand operations reviewed by file. |
|---|---|
| Turnkey inputs | Gerber, BOM, CPL/XY, assembly drawing, no-fit notes, test notes and packing requirements checked together. |
| Inspection / test | Required inspection, first article, functional test, programming, ICT or fixture needs are clarified before build release; AOI or X-ray is included when specified. |
| Build support | PCB fabrication, component sourcing, kitting, shortage review, assembly and delivery handled in one RFQ path. |
The build moves faster when files, BOM and test requirements are reviewed together.
Application context helps set the right inspection, sourcing, test and packing expectations.
Informic connects component sourcing strength with PCB and assembly review, so the quote is not split between disconnected suppliers.
PCB, BOM, SMT/DIP, inspection and test are shown as one managed workflow.
Gerber, BOM, CPL, assembly drawing and test notes are named where buyers expect them.
Informic's strongest advantage, component sourcing, is tied directly to turnkey assembly risk reduction.
The quote should separate the base assembly scope from optional inspection, programming and functional test work.
Most PCBA delays start before production. Send the files while placement, BOM and test risks are still easy to correct.
Use the PCB fabrication quote checklist to control Gerber, drill, stack-up, material, copper, finish, impedance, panelization and electrical-test requirements before the board moves into the PCBA build package.
Use the turnkey PCBA quote-package checklist to align the BOM, Gerber and drill files, CPL, assembly drawings, variants, test requirements, sourcing rules and delivery details before requesting a build quote.
Gerbers, BOM, CPL/XY placement file and assembly drawing are the core files. Test notes, firmware, programming and inspection requirements should be added when relevant.
Yes. Informic can review the BOM, source components, flag shortage items and discuss alternates before assembly.
Yes. Prototype, pilot and production builds can be reviewed, but file completeness and component availability strongly affect lead time.
Missing placement files, unclear polarity, unavailable parts, unapproved alternates and undefined test requirements are common quote and build blockers.
Send the files together so sourcing, fabrication, assembly and test questions can be reviewed before production starts.
Send the part number, BOM line, Gerber question or build blocker. Add quantity and delivery country so the first reply is useful.