Informic Logo
BOM Consolidation
PCBA Build Support
PCB Fabrication
Usually ships in 2–5 days

Shortage sourcing for manufacturers and EMS

Electronic Components
& BOM Sourcing

Start with 1-5 critical MPNs and quantities. Request availability, lead time, MOQ and packaging before sharing a complete BOM.

  • Exact parts: manufacturer, full MPN and quantity.
  • Mixed BOMs: ICs, memory, power, connectors and passives.
  • Shortage lines: source options and alternatives for buyer review.
Electronic components on a circuit board

Request a component quote

Send your critical MPNs, quantities, required date and delivery country. BOM upload is optional.


Your details are used to handle this quotation request. Privacy policy.

Prefer WhatsApp? Contact Informic.

One RFQ, matched to your requirement

A single MPN

Request the exact manufacturer, suffix and quantity, with packaging and delivery requirements.

A multi-line BOM

Consolidate mixed brands and component families. Available and constrained lines are quoted separately.

A shortage or EOL line

Review sourcing options, date code and traceability requirements. Alternatives require your approval.

What the quotation covers

Commercial details are tied to the exact part and quantity, not a generic stock claim.

Part and priceManufacturer, full MPN, package, quantity and unit price.
AvailabilitySupply options and quoted lead time for the requested quantity.
Order conditionsMOQ, reel or tray packaging, delivery country and required date.
Quality scopeDate-code and source-document requirements; additional inspection quoted when requested.

Incoming inspection and quality scope

Informic is ISO 9001 certified. Every incoming lot goes through QC before it ships: we check labels, date codes and appearance, and inspect leads and packaging under a microscope for signs of rework or opened reels and trays. Lot-specific source documents, date code, condition and traceability are stated in the written quotation before order acceptance.

When a project needs more, we arrange independent testing at Shenzhen laboratories such as White Horse Labs: X-ray, decapsulation, solderability or electrical testing. Method, sample size and report scope are agreed before the order, and lab fees are paid by the buyer. Before dispatch we send photos of the inspected parts and the packed shipment, followed by the tracking number. Brand coverage does not establish manufacturer-authorized distributor status.

Know the supplier before ordering

Review Informic's company information and component coverage.

Buyer approval remains part of the quote

  • Manufacturer and package must match your requirement.
  • Source documentation and inspection scope are stated before ordering.
  • Substitutions are kept separate from the requested MPN.

Need a board quote instead? PCB fabrication and Gerber RFQ.

Prepare a BOM for an accurate sourcing review

Use one row per requested part. Keep the manufacturer part number in a text column so a spreadsheet does not remove leading zeros or change the suffix. An internal stock code alone may not identify an orderable component.

BOM fieldWhat to provide
Manufacturer and full MPNInclude every suffix. Add the approved manufacturer or mark it as “to be confirmed”.
Required quantityState the quantity per line and separate prototype, production and forecast quantities.
Package and conditionInclude package, reel or tray needs, accepted condition and any date-code restrictions.
Timing and destinationState your required date and delivery country. Your target date is a requirement, not a confirmed delivery promise.
AlternatesState whether alternatives may be proposed. Keep requested MPNs separate from candidates requiring engineering approval.
Documentation and inspectionList required traceability, compliance records and test scope. Availability and suitability require written confirmation.

Before sending an RFQ

Can I request a quote without a BOM file?

Yes. Enter the manufacturer, exact part number and quantity in the form. Add your delivery country and required date when available.

Do you accept prototype or smaller production quantities?

Send the quantity you need. MOQ and packaging are confirmed for each exact part and available source.

Can you quote alternatives for unavailable parts?

Alternatives can be quoted separately. Electrical, package, firmware and qualification approval remain with your engineering team.

What happens after I send the requirement?

The request is recorded and sent to Informic's sales team. We review the part numbers and commercial details, and ask for missing information before quoting.

Which files can I send?

The BOM RFQ form accepts XLS, XLSX, CSV, PDF, ZIP and TXT, up to 20 MB per file. Upload only the information needed for the quotation; see the privacy policy.

Does a BOM quotation guarantee stock or delivery?

No. Stock, quantity, lead time, documentation and other order conditions are confirmed for the exact quoted line and lot before acceptance.

Translate »